FRIO TOWN

Substation

Texas · AEP TEXAS CENTRAL COMPANY

Max voltage
138
kV

FRIO TOWN is an electric transmission substation in Texas, operated by AEP TEXAS CENTRAL COMPANY. It is classified as sub-transmission (138 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines1

Ownership & operation

OperatorAEP TEXAS CENTRAL COMPANY
StateTexas
Coordinates29.0221, -99.3434

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#84600138 kVAEP TEXAS CENTRAL COMPANY18.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of FRIO TOWN, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near FRIO TOWN substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
DOWNIESubstation-AdjacentTXUvalde County345 kV600 MW3.4 yrs67.5
TAP307847Substation-AdjacentTXMedina County138 kV100 MW3.4 yrs66.3
MOORESubstation-AdjacentTXFrio County345 kV600 MW3.4 yrs66.2
TAP302617Substation-AdjacentTXMedina County138 kV100 MW3.4 yrs64.0
HONDOSubstation-AdjacentTXMedina County138 kV100 MW3.4 yrs62.9
UNKNOWN310456Substation-AdjacentTXMedina County138 kV100 MW3.4 yrs62.8
PEARSALL POWER PLANTSubstation-AdjacentTXFrio County345 kV600 MW3.4 yrs62.4
HONDO CREEKSubstation-AdjacentTXMedina County138 kV100 MW3.4 yrs62.0

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for FRIO TOWN substation, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.