FOREST GROVE

Substation

Texas · ONCOR ELECTRIC DELIVERY CO.

Max voltage
345
kV

FOREST GROVE is an electric transmission substation in Texas, operated by ONCOR ELECTRIC DELIVERY CO.. It is classified as high-voltage (345 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage345 kV
Min voltage138 kV
Voltage classHigh-voltage (345 kV)
Connected lines2

Ownership & operation

OperatorONCOR ELECTRIC DELIVERY CO.
StateTexas
Coordinates32.2347, -95.9493

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#83179345 kVONCOR ELECTRIC DELIVERY CO.IN SERVICE15.3 mi
#79842138 kVONCOR ELECTRIC DELIVERY CO.IN SERVICE4.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of FOREST GROVE, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near FOREST GROVE substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
FOREST GROVESubstation-AdjacentTXHenderson County345 kV600 MW3.4 yrs69.5
UNKNOWN306214Substation-AdjacentTXVan Zandt County345 kV600 MW3.4 yrs68.7
TRINIDADSubstation-AdjacentTXHenderson County345 kV600 MW3.4 yrs68.7
UNKNOWN307009Substation-AdjacentTXHenderson County138 kV100 MW3.4 yrs63.9
UNKNOWN306597Substation-AdjacentTXKaufman County138 kV100 MW3.4 yrs63.6
FREESTONE ENERGY CENTERSubstation-AdjacentTXFreestone County345 kV600 MW3.4 yrs63.5
UNKNOWN310371Substation-AdjacentTXKaufman County138 kV100 MW3.4 yrs63.4
Greenfield (UNKNOWN306553 - TRI-CORNER)GreenfieldTXVan Zandt County345 kV600 MW3.4 yrs63.2

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for FOREST GROVE substation, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.