FLOYD
SubstationTexas · CITY OF FLOYDADA - (TX)
FLOYD is an electric transmission substation in Texas, operated by CITY OF FLOYDADA - (TX). It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Ownership & operation
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #87260 | 115 kV | CITY OF FLOYDADA - (TX) | IN SERVICE | 6.8 mi |
| #89047 | 115 kV | LIGHTHOUSE ELECTRIC COOP, INC | IN SERVICE | 170.4 mi |
| #91739 | 115 kV | CITY OF FLOYDADA - (TX) | IN SERVICE | 5.8 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of FLOYD, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| UNKNOWN303927 | Substation-Adjacent | TX | Hale County | 230 kV | 300 MW | 3.4 yrs | 70.2 |
| LONGHORN WIND | Substation-Adjacent | TX | Briscoe County | 345 kV | 600 MW | 3.4 yrs | 68.6 |
| TUCO | Substation-Adjacent | TX | Hale County | 345 kV | 600 MW | 3.4 yrs | 67.7 |
| UNKNOWN300970 | Substation-Adjacent | TX | Lubbock County | 115 kV | 100 MW | 3.4 yrs | 66.7 |
| UNKNOWN302294 | Substation-Adjacent | TX | Lubbock County | 115 kV | 100 MW | 3.4 yrs | 66.6 |
| UNKNOWN305893 | Substation-Adjacent | TX | Lubbock County | 115 kV | 100 MW | 3.4 yrs | 66.5 |
| UNKNOWN303755 | Substation-Adjacent | TX | Lubbock County | 115 kV | 100 MW | 3.4 yrs | 66.1 |
| WHITE RIVER | Substation-Adjacent | TX | Floyd County | 345 kV | 600 MW | 3.4 yrs | 65.8 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.