FIESTA

Substation

Texas · ONCOR ELECTRIC DELIVERY CO.

Max voltage
138
kV

FIESTA is an electric transmission substation in Texas, operated by ONCOR ELECTRIC DELIVERY CO.. It is classified as sub-transmission (138 kv) and connects 6 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage115 kV
Voltage classSub-transmission (138 kV)
Connected lines6

Ownership & operation

OperatorONCOR ELECTRIC DELIVERY CO.
Co-ownerSOUTHWEST PUBLIC SERVICE COMPANY
StateTexas
Coordinates31.7136, -102.0518

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#86312138 kVONCOR ELECTRIC DELIVERY CO.3.9 mi
#87085138 kVONCOR ELECTRIC DELIVERY CO.IN SERVICE2.0 mi
#84163115 kVSOUTHWEST PUBLIC SERVICE COMPANYIN SERVICE1.9 mi
#84221115 kVSOUTHWEST PUBLIC SERVICE COMPANYIN SERVICE1.9 mi
#87919115 kVIN SERVICE19.0 mi
#92165115 kVSOUTHWEST PUBLIC SERVICE COMPANY0.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of FIESTA, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near FIESTA substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN310183Substation-AdjacentTXEctor County345 kV600 MW3.4 yrs68.3
UNKNOWN301162Substation-AdjacentTXMidland County345 kV600 MW3.4 yrs67.8
UNKNOWN303932Substation-AdjacentTXEctor County345 kV600 MW3.4 yrs66.9
UNKNOWN303406Substation-AdjacentTXMidland County138 kV100 MW3.4 yrs62.7
Greenfield (UNKNOWN301162 - UNKNOWN301484)GreenfieldTXMartin County345 kV600 MW3.4 yrs62.7
TAP307917Substation-AdjacentTXEctor County138 kV100 MW3.4 yrs62.4
UNKNOWN306826Substation-AdjacentTXEctor County138 kV100 MW3.4 yrs62.4
UNKNOWN309658Substation-AdjacentTXMidland County138 kV100 MW3.4 yrs62.2

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for FIESTA substation, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.