ETTER RURAL

Substation

Texas · RITA BLANCA ELECTRIC COOP, INC

Max voltage
115
kV

ETTER RURAL is an electric transmission substation in Texas, operated by RITA BLANCA ELECTRIC COOP, INC. It is classified as sub-transmission (115 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines2

Ownership & operation

OperatorRITA BLANCA ELECTRIC COOP, INC
Co-ownerSOUTHWESTERN PUBLIC SERVICE CO
StateTexas
Coordinates36.0253, -101.9757

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#90150115 kVRITA BLANCA ELECTRIC COOP, INCIN SERVICE11.6 mi
#91826115 kVSOUTHWESTERN PUBLIC SERVICE COIN SERVICE10.3 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of ETTER RURAL, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near ETTER RURAL substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
MOORE COUNTYSubstation-AdjacentTXMoore County230 kV300 MW3.4 yrs67.8
TAP305332Substation-AdjacentTXMoore County115 kV100 MW3.4 yrs64.0
ETTER RURALSubstation-AdjacentTXMoore County115 kV100 MW3.4 yrs63.5
EXCELLSubstation-AdjacentTXMoore County115 kV100 MW3.4 yrs63.4
CHANNINGSubstation-AdjacentTXHartley County115 kV100 MW3.4 yrs63.3
SUNRAY WIND ISubstation-AdjacentTXMoore County115 kV100 MW3.4 yrs63.0
SHAMROCK MC KEESubstation-AdjacentTXMoore County115 kV100 MW3.4 yrs62.8
Greenfield (POTTER COUNTY - HITCHLAND)GreenfieldTXSherman County345 kV600 MW3.4 yrs62.7

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen