ESCONDIDO
SubstationTexas · AEP TEXAS CENTRAL CO.
ESCONDIDO is an electric transmission substation in Texas, operated by AEP TEXAS CENTRAL CO.. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Ownership & operation
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #79284 | 138 kV | AEP TEXAS CENTRAL CO. | IN SERVICE | 1.4 mi |
| #82677 | 138 kV | AEP TEXAS CENTRAL CO. | IN SERVICE | 10.0 mi |
| #88510 | 138 kV | AEP TEXAS CENTRAL COMPANY | — | 5.8 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of ESCONDIDO, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| ESCONDIDO | Substation-Adjacent | TX | Maverick County | 138 kV | 100 MW | 3.4 yrs | 59.7 |
| ROSITA CREEK | Substation-Adjacent | TX | Maverick County | 138 kV | 100 MW | 3.4 yrs | 59.7 |
| UNKNOWN303114 | Substation-Adjacent | TX | Maverick County | 138 kV | 100 MW | 3.4 yrs | 59.7 |
| EAGLE PASS | Substation-Adjacent | TX | Maverick County | 138 kV | 100 MW | 3.4 yrs | 58.1 |
| UNKNOWN300181 | Substation-Adjacent | TX | Maverick County | 138 kV | 100 MW | 3.4 yrs | 57.6 |
| PUEBLO | Substation-Adjacent | TX | Maverick County | 138 kV | 100 MW | 3.4 yrs | 55.4 |
| UNKNOWN303123 | Substation-Adjacent | TX | Maverick County | 138 kV | 100 MW | 3.4 yrs | 54.0 |
| Greenfield (ESCONDIDO - TAP308157) | Greenfield | TX | Maverick County | 138 kV | 100 MW | 3.4 yrs | 52.9 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.