ENGINEERED CARBONS BORGER COGEN

Substation

Texas · SOUTHWESTERN PUBLIC SERVICE CO.

Max voltage
115
kV

ENGINEERED CARBONS BORGER COGEN is an electric transmission substation in Texas, operated by SOUTHWESTERN PUBLIC SERVICE CO.. It is classified as sub-transmission (115 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines1

Ownership & operation

OperatorSOUTHWESTERN PUBLIC SERVICE CO.
StateTexas
Coordinates35.6662, -101.4332

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#87924115 kVSOUTHWESTERN PUBLIC SERVICE CO.0.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of ENGINEERED CARBONS BORGER COGEN, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near ENGINEERED CARBONS BORGER COGEN substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
HARRINGTONSubstation-AdjacentTXPotter County230 kV300 MW3.4 yrs72.9
TAP302718Substation-AdjacentTXPotter County230 kV300 MW3.4 yrs72.2
RAILHEADSubstation-AdjacentTXCarson County345 kV600 MW3.4 yrs69.0
OSubstation-AdjacentTXPotter County115 kV100 MW3.4 yrs68.8
MARTIN SWITCHING STATIONSubstation-AdjacentTXCarson County230 kV300 MW3.4 yrs67.1
JACK RAMEY WINDSubstation-AdjacentTXCarson County345 kV600 MW3.4 yrs66.4
UNKNOWN308238Substation-AdjacentTXGray County230 kV300 MW3.4 yrs66.4
CRMWA#4Substation-AdjacentTXPotter County115 kV100 MW3.4 yrs65.9

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for ENGINEERED CARBONS BORGER COGEN substation, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.