ELK CITY LLC

Substation

Texas · PUBLIC SERVICE CO OF OKLAHOMA

Max voltage
230
kV

ELK CITY LLC is an electric transmission substation in Texas, operated by PUBLIC SERVICE CO OF OKLAHOMA. It is classified as high-voltage (230 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines2

Ownership & operation

OperatorPUBLIC SERVICE CO OF OKLAHOMA
StateTexas
Coordinates35.4785, -99.8949

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#40006230 kVPUBLIC SERVICE CO OF OKLAHOMAIN SERVICE8.4 mi
#64173230 kVPUBLIC SERVICE CO OF OKLAHOMA0.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of ELK CITY LLC, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near ELK CITY LLC substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
BORDERSubstation-AdjacentOKBeckham County345 kV600 MW3.4 yrs71.6
UNKNOWN159874Substation-AdjacentOKBeckham County345 kV600 MW3.4 yrs71.2
UNKNOWN168526Substation-AdjacentOKBeckham County230 kV300 MW3.4 yrs68.7
UNKNOWN118502Substation-AdjacentOKBeckham County230 kV300 MW3.4 yrs67.4
Greenfield (CHISHOLM - UNKNOWN159874)GreenfieldOKBeckham County345 kV600 MW3.4 yrs65.5
ELK CITY LLCSubstation-AdjacentOKRoger Mills County230 kV300 MW3.4 yrs65.3
UNKNOWN168527Substation-AdjacentOKRoger Mills County230 kV300 MW3.4 yrs64.9
UNKNOWN118728Substation-AdjacentOKBeckham County138 kV100 MW3.4 yrs64.2

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for ELK CITY LLC substation, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.