EDISON

Substation

Texas · CENTRAL TEXAS ELEC COOP, INC

Max voltage
345
kV

EDISON is an electric transmission substation in Texas, operated by CENTRAL TEXAS ELEC COOP, INC. It is classified as high-voltage (345 kv) and connects 4 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage345 kV
Min voltage345 kV
Voltage classHigh-voltage (345 kV)
Connected lines4

Ownership & operation

OperatorCENTRAL TEXAS ELEC COOP, INC
Co-ownerPEDERNALES ELECTRIC COOP, INC
StateTexas
Coordinates30.3332, -99.5762

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#85288345 kVPEDERNALES ELECTRIC COOP, INCIN SERVICE52.8 mi
#89646345 kVCENTRAL TEXAS ELEC COOP, INCIN SERVICE51.5 mi
#91517345 kVPEDERNALES ELECTRIC COOP, INCIN SERVICE52.8 mi
#92155345 kVCENTRAL TEXAS ELEC COOP, INCIN SERVICE51.5 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of EDISON, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near EDISON substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
EDISONSubstation-AdjacentTXKimble County345 kV600 MW3.4 yrs62.0
UNKNOWN310477Substation-AdjacentTXKerr County138 kV100 MW3.4 yrs59.8
UNKNOWN306519Substation-AdjacentTXKerr County138 kV100 MW3.4 yrs59.8
UNKNOWN301004Substation-AdjacentTXKerr County138 kV100 MW3.4 yrs58.7
UNKNOWN308952Substation-AdjacentTXKerr County138 kV100 MW3.4 yrs58.3
Greenfield (UNKNOWN310485 - UNKNOWN307500)GreenfieldTXGillespie County345 kV600 MW3.4 yrs58.2
Greenfield (KENDALL - EDISON)GreenfieldTXKerr County345 kV600 MW3.4 yrs57.9
UNKNOWN309350Substation-AdjacentTXKimble County138 kV100 MW3.4 yrs57.6

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for EDISON substation, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.