EDDY AC-DC-AC TIE
SubstationTexas
EDDY AC-DC-AC TIE is an electric transmission substation in Texas. It is classified as high-voltage (345 kv) and connects 8 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Ownership & operation
Operator not catalogued for this substation.
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #88281 | 345 kV | — | IN SERVICE | 125.4 mi |
| #88419 | 345 kV | — | IN SERVICE | 157.9 mi |
| #92106 | 230 kV | — | IN SERVICE | 58.7 mi |
| #86513 | 230 kV | — | IN SERVICE | 52.6 mi |
| #82171 | 230 kV | — | IN SERVICE | 24.4 mi |
| #87293 | 115 kV | — | IN SERVICE | 9.5 mi |
| #84380 | 115 kV | — | IN SERVICE | 27.5 mi |
| #81483 | 115 kV | — | IN SERVICE | 44.8 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of EDDY AC-DC-AC TIE, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| EDDY AC-DC-AC TIE | Substation-Adjacent | NM | Eddy County | 345 kV | 600 MW | 3.4 yrs | 69.2 |
| PCA | Substation-Adjacent | NM | Eddy County | 230 kV | 300 MW | 3.4 yrs | 64.5 |
| UNKNOWN305514 | Substation-Adjacent | NM | Eddy County | 230 kV | 300 MW | 3.4 yrs | 63.4 |
| COTTONWOOD TAP | Substation-Adjacent | NM | Chaves County | 115 kV | 100 MW | 3.4 yrs | 63.2 |
| UNKNOWN306969 | Substation-Adjacent | NM | Eddy County | 230 kV | 300 MW | 3.4 yrs | 63.1 |
| POTASH JUNCTION | Substation-Adjacent | NM | Eddy County | 230 kV | 300 MW | 3.4 yrs | 62.9 |
| MISS POTASH | Substation-Adjacent | NM | Eddy County | 230 kV | 300 MW | 3.4 yrs | 62.9 |
| Greenfield (AMRAD - EDDY AC-DC-AC TIE) | Greenfield | NM | Eddy County | 345 kV | 600 MW | 3.4 yrs | 62.3 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for EDDY AC-DC-AC TIE substation, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.