EAGLE PASS

Substation

Texas · AEP TEXAS CENTRAL CO.

Max voltage
138
kV

EAGLE PASS is an electric transmission substation in Texas, operated by AEP TEXAS CENTRAL CO.. It is classified as sub-transmission (138 kv) and connects 4 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines4

Ownership & operation

OperatorAEP TEXAS CENTRAL CO.
Co-ownerAEP TEXAS CENTRAL COMPANY
StateTexas
Coordinates28.7444, -100.5059

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#79284138 kVAEP TEXAS CENTRAL CO.IN SERVICE1.4 mi
#82284138 kVAEP TEXAS CENTRAL COMPANYIN SERVICE19.0 mi
#82627138 kVAEP TEXAS CENTRAL COMPANY1.2 mi
#90757138 kVAEP TEXAS CENTRAL CO.0.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of EAGLE PASS, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near EAGLE PASS substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
ESCONDIDOSubstation-AdjacentTXMaverick County138 kV100 MW3.4 yrs59.7
ROSITA CREEKSubstation-AdjacentTXMaverick County138 kV100 MW3.4 yrs59.7
UNKNOWN303114Substation-AdjacentTXMaverick County138 kV100 MW3.4 yrs59.7
EAGLE PASSSubstation-AdjacentTXMaverick County138 kV100 MW3.4 yrs58.1
UNKNOWN300181Substation-AdjacentTXMaverick County138 kV100 MW3.4 yrs57.6
PUEBLOSubstation-AdjacentTXMaverick County138 kV100 MW3.4 yrs55.4
UNKNOWN303123Substation-AdjacentTXMaverick County138 kV100 MW3.4 yrs54.0
Greenfield (ESCONDIDO - TAP308157)GreenfieldTXMaverick County138 kV100 MW3.4 yrs52.9

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for EAGLE PASS substation, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.