DOWNIE

Substation

Texas · AEP TEXAS CENTRAL COMPANY

Max voltage
345
kV

DOWNIE is an electric transmission substation in Texas, operated by AEP TEXAS CENTRAL COMPANY. It is classified as high-voltage (345 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage345 kV
Min voltage138 kV
Voltage classHigh-voltage (345 kV)
Connected lines2

Ownership & operation

OperatorAEP TEXAS CENTRAL COMPANY
Co-ownerBANDERA ELECTRIC COOP, INC
StateTexas
Coordinates29.2270, -99.6995

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#89041345 kVAEP TEXAS CENTRAL COMPANYIN SERVICE40.6 mi
#83820138 kVBANDERA ELECTRIC COOP, INCIN SERVICE9.2 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of DOWNIE, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near DOWNIE substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
DOWNIESubstation-AdjacentTXUvalde County345 kV600 MW3.4 yrs67.5
UNKNOWN307038Substation-AdjacentTXUvalde County138 kV100 MW3.4 yrs60.9
ASPHALT MINESSubstation-AdjacentTXUvalde County138 kV100 MW3.4 yrs60.5
Greenfield (MOORE - DOWNIE)GreenfieldTXUvalde County345 kV600 MW3.4 yrs59.5
Greenfield (MOORE - DOWNIE)GreenfieldTXMedina County345 kV600 MW3.4 yrs59.4
UVALDESubstation-AdjacentTXUvalde County138 kV100 MW3.4 yrs59.4
Greenfield (MOORE - DOWNIE)GreenfieldTXUvalde County345 kV600 MW3.4 yrs59.1
NORTH BATESVILLESubstation-AdjacentTXZavala County138 kV100 MW3.4 yrs58.8

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.