DEL SOL

Substation

Texas · AEP TEXAS CENTRAL

Max voltage
345
kV

DEL SOL is an electric transmission substation in Texas, operated by AEP TEXAS CENTRAL. It is classified as high-voltage (345 kv) and connects 4 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage345 kV
Min voltage345 kV
Voltage classHigh-voltage (345 kV)
Connected lines4

Ownership & operation

OperatorAEP TEXAS CENTRAL
Co-ownerAEP TEXAS CENTRAL COMPANY
StateTexas
Coordinates26.4578, -98.7371

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#85061345 kVAEP TEXAS CENTRAL COMPANY19.0 mi
#87936345 kVAEP TEXAS CENTRAL COMPANYIN SERVICE82.1 mi
#89355345 kVAEP TEXAS CENTRALIN SERVICE12.5 mi
#92327345 kVAEP TEXAS CENTRAL COMPANY10.9 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of DEL SOL, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near DEL SOL substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
POMELOSubstation-AdjacentTXHidalgo County345 kV600 MW3.4 yrs70.7
DEL SOLSubstation-AdjacentTXStarr County345 kV600 MW3.4 yrs68.9
MIGHOWARDSubstation-AdjacentTXStarr County345 kV600 MW3.4 yrs68.8
UNKNOWN302118Substation-AdjacentTXHidalgo County138 kV100 MW3.4 yrs68.7
UNKNOWN306601Substation-AdjacentTXHidalgo County138 kV100 MW3.4 yrs68.2
TAP302506Substation-AdjacentTXHidalgo County138 kV100 MW3.4 yrs67.6
UNKNOWN309980Substation-AdjacentTXHidalgo County138 kV100 MW3.4 yrs67.4
UNKNOWN305583Substation-AdjacentTXHidalgo County138 kV100 MW3.4 yrs67.2

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for DEL SOL substation, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.