DEAF SMITH

Substation

Texas · DEAF SMITH ELECTRIC COOP, INC

Max voltage
230
kV

DEAF SMITH is an electric transmission substation in Texas, operated by DEAF SMITH ELECTRIC COOP, INC. It is classified as high-voltage (230 kv) and connects 5 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage115 kV
Voltage classHigh-voltage (230 kV)
Connected lines5

Ownership & operation

OperatorDEAF SMITH ELECTRIC COOP, INC
Co-ownerSOUTHWESTERN PUBLIC SERVICE CO
StateTexas
Coordinates34.8209, -102.3608

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#81996230 kVSOUTHWESTERN PUBLIC SERVICE COIN SERVICE47.0 mi
#85424230 kVSOUTHWESTERN PUBLIC SERVICE COIN SERVICE33.4 mi
#87271138 kVDEAF SMITH ELECTRIC COOP, INCIN SERVICE2.2 mi
#82515115 kVDEAF SMITH ELECTRIC COOP, INCIN SERVICE21.6 mi
#87900115 kVDEAF SMITH ELECTRIC COOP, INCIN SERVICE3.4 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of DEAF SMITH, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near DEAF SMITH substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
OGALLALASubstation-AdjacentTXCastro County345 kV600 MW3.4 yrs70.9
BUSHLANDSubstation-AdjacentTXRandall County230 kV300 MW3.4 yrs70.6
WINDMILLSubstation-AdjacentTXCastro County345 kV600 MW3.4 yrs70.4
Greenfield (POTTER COUNTY - PLANT X)GreenfieldTXRandall County230 kV300 MW3.4 yrs66.0
Greenfield (POTTER COUNTY - BUSHLAND)GreenfieldTXPotter County230 kV300 MW3.4 yrs65.8
UNKNOWN308766Substation-AdjacentTXCastro County138 kV100 MW3.4 yrs65.5
Greenfield (POTTER COUNTY - PLANT X)GreenfieldTXPotter County230 kV300 MW3.4 yrs65.0
DAWNSubstation-AdjacentTXRandall County115 kV100 MW3.4 yrs64.7

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for DEAF SMITH substation, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.