CUERO

Substation

Texas · AEP TEXAS CENTRAL COMPANY

Max voltage
138
kV

CUERO is an electric transmission substation in Texas, operated by AEP TEXAS CENTRAL COMPANY. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

OperatorAEP TEXAS CENTRAL COMPANY
StateTexas
Coordinates29.1074, -97.2724

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#84424138 kVAEP TEXAS CENTRAL COMPANY10.9 mi
#87027138 kVAEP TEXAS CENTRAL COMPANYIN SERVICE13.9 mi
#88294138 kVAEP TEXAS CENTRAL COMPANY2.9 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of CUERO, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near CUERO substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN308445Substation-AdjacentTXVictoria County345 kV600 MW3.4 yrs70.8
UNKNOWN300739Substation-AdjacentTXVictoria County345 kV600 MW3.4 yrs68.2
UNKNOWN307020Substation-AdjacentTXGoliad County345 kV600 MW3.4 yrs67.6
Greenfield (SOTEX5 - ELM CREEK)GreenfieldTXDeWitt County345 kV600 MW3.4 yrs63.2
UNKNOWN310061Substation-AdjacentTXDeWitt County138 kV100 MW3.4 yrs62.0
NORDHEIMSubstation-AdjacentTXKarnes County138 kV100 MW3.4 yrs61.9
Greenfield (None - None)GreenfieldTXDeWitt County345 kV600 MW3.4 yrs61.7
UNKNOWN305787Substation-AdjacentTXVictoria County138 kV100 MW3.4 yrs61.6

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.