CROSS

Substation

Texas · LIGHTHOUSE ELECTRIC COOP, INC

Max voltage
345
kV

CROSS is an electric transmission substation in Texas, operated by LIGHTHOUSE ELECTRIC COOP, INC. It is classified as high-voltage (345 kv) and connects 4 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage345 kV
Min voltage138 kV
Voltage classHigh-voltage (345 kV)
Connected lines4

Ownership & operation

OperatorLIGHTHOUSE ELECTRIC COOP, INC
StateTexas
Coordinates34.3440, -100.8937

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#83747345 kVLIGHTHOUSE ELECTRIC COOP, INCIN SERVICE52.7 mi
#84302345 kVLIGHTHOUSE ELECTRIC COOP, INCIN SERVICE34.9 mi
#85402345 kVLIGHTHOUSE ELECTRIC COOP, INCIN SERVICE34.9 mi
#84601138 kVLIGHTHOUSE ELECTRIC COOP, INCIN SERVICE52.7 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of CROSS, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near CROSS substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
LONGHORN WINDSubstation-AdjacentTXBriscoe County345 kV600 MW3.4 yrs68.6
WHITE RIVERSubstation-AdjacentTXFloyd County345 kV600 MW3.4 yrs65.8
UNKNOWN304100Substation-AdjacentTXMotley County230 kV300 MW3.4 yrs64.4
CROSSSubstation-AdjacentTXHall County345 kV600 MW3.4 yrs64.1
Greenfield (CROSS - TULE CANYON)GreenfieldTXBriscoe County345 kV600 MW3.4 yrs61.0
Greenfield (TULE CANYON - CROSS)GreenfieldTXBriscoe County345 kV600 MW3.4 yrs60.7
Greenfield (TULE CANYON - COTTONWOOD)GreenfieldTXFloyd County345 kV600 MW3.4 yrs59.8
Greenfield (TULE CANYON - CROSS)GreenfieldTXBriscoe County345 kV600 MW3.4 yrs59.8

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.