COLORADO BEND ENERGY CENTER

Substation

Texas · CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC

Max voltage
138
kV

COLORADO BEND ENERGY CENTER is an electric transmission substation in Texas, operated by CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC. It is classified as sub-transmission (138 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines1

Ownership & operation

OperatorCENTERPOINT ENERGY HOUSTON ELECTRIC, LLC
StateTexas
Coordinates29.2884, -96.0689

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#87440138 kVCENTERPOINT ENERGY HOUSTON ELECTRIC, LLCIN SERVICE0.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of COLORADO BEND ENERGY CENTER, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near COLORADO BEND ENERGY CENTER substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
O'BRIENSubstation-AdjacentTXFort Bend County345 kV600 MW3.4 yrs71.2
Greenfield (O'BRIEN - PARISH)GreenfieldTXFort Bend County345 kV600 MW3.4 yrs67.1
BLESSINGSubstation-AdjacentTXMatagorda County345 kV600 MW3.4 yrs65.0
UNKNOWN308688Substation-AdjacentTXWharton County138 kV100 MW3.4 yrs64.3
CRABB RIVER ROADSubstation-AdjacentTXFort Bend County138 kV100 MW3.4 yrs64.2
UNKNOWN310390Substation-AdjacentTXBrazoria County138 kV100 MW3.4 yrs64.1
UNKNOWN310023Substation-AdjacentTXFort Bend County138 kV100 MW3.4 yrs63.9
UNKNOWN304491Substation-AdjacentTXFort Bend County138 kV100 MW3.4 yrs63.8

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for COLORADO BEND ENERGY CENTER substation, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.