COLE

Substation

Texas · TRI-COUNTY ELECTRIC COOP, INC

Max voltage
115
kV

COLE is an electric transmission substation in Texas, operated by TRI-COUNTY ELECTRIC COOP, INC. It is classified as sub-transmission (115 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines1

Ownership & operation

OperatorTRI-COUNTY ELECTRIC COOP, INC
StateTexas
Coordinates36.4086, -100.8172

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#13164115 kVTRI-COUNTY ELECTRIC COOP, INCIN SERVICE16.2 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of COLE, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near COLE substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN148745Substation-AdjacentTXOchiltree County345 kV600 MW3.5 yrs65.8
COLESubstation-AdjacentTXOchiltree County115 kV100 MW3.4 yrs63.9
BEAVER COUNTYSubstation-AdjacentTXOchiltree County345 kV600 MW3.5 yrs63.9
Greenfield (WOODWARD - BEAVER COUNTY)GreenfieldOKBeaver County345 kV600 MW3.4 yrs63.8
Greenfield (WOODWARD - BEAVER COUNTY)GreenfieldOKBeaver County345 kV600 MW3.4 yrs63.5
Greenfield (WOODWARD - BEAVER COUNTY)GreenfieldOKBeaver County345 kV600 MW3.4 yrs63.4
SPEARMAN CITYSubstation-AdjacentTXHansford County115 kV100 MW3.4 yrs63.2
UNKNOWN118716Substation-AdjacentOKBeaver County115 kV100 MW3.5 yrs62.9

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for COLE substation, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.