CLEVELAND

Substation

Texas · CENTERPOINT ENERGY

Max voltage
345
kV

CLEVELAND is an electric transmission substation in Texas, operated by CENTERPOINT ENERGY. It is classified as high-voltage (345 kv) and connects 5 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage345 kV
Min voltage138 kV
Voltage classHigh-voltage (345 kV)
Connected lines5

Ownership & operation

OperatorCENTERPOINT ENERGY
Co-ownerPUBLIC SERVICE CO OF OKLAHOMA
Co-ownerSAM HOUSTON ELECTRIC COOP INC
StateTexas
Coordinates33.9488, -95.9187

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#3511345 kVPUBLIC SERVICE CO OF OKLAHOMAIN SERVICE31.4 mi
#28373345 kVIN SERVICE36.1 mi
#13893138 kVPUBLIC SERVICE CO OF OKLAHOMAIN SERVICE0.2 mi
#84236138 kVSAM HOUSTON ELECTRIC COOP INCIN SERVICE13.2 mi
#92782138 kVCENTERPOINT ENERGYIN SERVICE9.4 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of CLEVELAND, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near CLEVELAND substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
CLEVELANDSubstation-AdjacentOKBryan County345 kV600 MW3.4 yrs70.4
JOHNSONSubstation-AdjacentTXFannin County345 kV600 MW3.4 yrs67.5
UNKNOWN300188Substation-AdjacentTXLamar County345 kV600 MW3.4 yrs67.2
Greenfield (KIAMICHI STATION - UNKNOWN3013)GreenfieldOKBryan County345 kV600 MW3.4 yrs66.5
Greenfield (HUGO (345 KV) - SUNNYSIDE)GreenfieldOKBryan County345 kV600 MW3.4 yrs65.8
UNKNOWN118759Substation-AdjacentOKBryan County138 kV100 MW3.4 yrs65.4
UNKNOWN118769Substation-AdjacentOKBryan County138 kV100 MW3.4 yrs65.3
UNKNOWN118831Substation-AdjacentOKChoctaw County138 kV100 MW3.4 yrs65.1

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for CLEVELAND substation, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.