CLEAR CROSSING
SubstationTexas · BIG COUNTRY ELECTRIC COOP, INC
CLEAR CROSSING is an electric transmission substation in Texas, operated by BIG COUNTRY ELECTRIC COOP, INC. It is classified as high-voltage (345 kv) and connects 7 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Ownership & operation
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #85538 | 345 kV | TRI-COUNTY ELECTRIC COOP, INC | IN SERVICE | 38.4 mi |
| #85809 | 345 kV | BIG COUNTRY ELECTRIC COOP, INC | IN SERVICE | 39.6 mi |
| #86634 | 345 kV | TRI-COUNTY ELECTRIC COOP, INC | IN SERVICE | 38.4 mi |
| #88673 | 345 kV | BIG COUNTRY ELECTRIC COOP, INC | IN SERVICE | 33.9 mi |
| #89621 | 345 kV | BIG COUNTRY ELECTRIC COOP, INC | — | 109.4 mi |
| #92021 | 345 kV | BIG COUNTRY ELECTRIC COOP, INC | IN SERVICE | 39.6 mi |
| #92444 | 345 kV | BIG COUNTRY ELECTRIC COOP, INC | IN SERVICE | 33.9 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of CLEAR CROSSING, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| CLEAR CROSSING | Substation-Adjacent | TX | Haskell County | 345 kV | 600 MW | 3.4 yrs | 67.1 |
| WEST SHACKELFORD | Substation-Adjacent | TX | Shackelford County | 345 kV | 600 MW | 3.4 yrs | 66.5 |
| UNKNOWN304401 | Substation-Adjacent | TX | Haskell County | 345 kV | 600 MW | 3.4 yrs | 66.1 |
| UNKNOWN300620 | Substation-Adjacent | TX | Shackelford County | 345 kV | 600 MW | 3.4 yrs | 65.8 |
| UNKNOWN302279 | Substation-Adjacent | TX | Shackelford County | 345 kV | 600 MW | 3.4 yrs | 65.7 |
| Greenfield (UNKNOWN304477 - ABILENE MULBER) | Greenfield | TX | Jones County | 345 kV | 600 MW | 3.4 yrs | 63.1 |
| Greenfield (UNKNOWN304477 - ABILENE MULBER) | Greenfield | TX | Jones County | 345 kV | 600 MW | 3.4 yrs | 62.0 |
| Greenfield (CLEAR CROSSING - UNKNOWN303772) | Greenfield | TX | Haskell County | 345 kV | 600 MW | 3.4 yrs | 60.7 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for CLEAR CROSSING substation, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.