CENTENNIAL WIND FARM

Substation

Texas · OKLAHOMA GAS & ELECTRIC CO

Max voltage
138
kV

CENTENNIAL WIND FARM is an electric transmission substation in Texas, operated by OKLAHOMA GAS & ELECTRIC CO. It is classified as sub-transmission (138 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines1

Ownership & operation

OperatorOKLAHOMA GAS & ELECTRIC CO
StateTexas
Coordinates36.6379, -99.6030

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#20880138 kVOKLAHOMA GAS & ELECTRIC COIN SERVICE33.2 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of CENTENNIAL WIND FARM, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near CENTENNIAL WIND FARM substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
THISTLESubstation-AdjacentOKWoodward County345 kV600 MW3.4 yrs72.1
WOODWARDSubstation-AdjacentOKWoodward County345 kV600 MW3.4 yrs71.7
UNKNOWN118333Substation-AdjacentOKWoodward County138 kV100 MW3.4 yrs65.4
OU SPIRIT WIND FARMSubstation-AdjacentOKWoodward County138 kV100 MW3.4 yrs64.4
UNKNOWN118851Substation-AdjacentOKWoodward County138 kV100 MW3.5 yrs64.3
Greenfield (WOODWARD - BEAVER COUNTY)GreenfieldOKEllis County345 kV600 MW3.4 yrs63.9
Greenfield (TATONGA - WOODWARD)GreenfieldOKWoodward County345 kV600 MW3.4 yrs63.6
Greenfield (WOODWARD - BEAVER COUNTY)GreenfieldOKHarper County345 kV600 MW3.4 yrs63.5

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for CENTENNIAL WIND FARM substation, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.