CENIZO

Substation

Texas · AEP

Max voltage
345
kV

CENIZO is an electric transmission substation in Texas, operated by AEP. It is classified as high-voltage (345 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage345 kV
Min voltage345 kV
Voltage classHigh-voltage (345 kV)
Connected lines3

Ownership & operation

OperatorAEP
Co-ownerAEP TEXAS CENTRAL COMPANY
StateTexas
Coordinates27.3275, -99.4117

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#83515345 kVAEP TEXAS CENTRAL COMPANYIN SERVICE29.1 mi
#87936345 kVAEP TEXAS CENTRAL COMPANYIN SERVICE82.1 mi
#89230345 kVAEPIN SERVICE26.7 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of CENIZO, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near CENIZO substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
LOBOSubstation-AdjacentTXWebb County345 kV600 MW3.4 yrs72.6
CENIZOSubstation-AdjacentTXZapata County345 kV600 MW3.4 yrs70.9
UNKNOWN305005Substation-AdjacentTXWebb County138 kV100 MW3.4 yrs69.5
LAREDOSubstation-AdjacentTXWebb County138 kV100 MW3.4 yrs69.2
UNKNOWN303749Substation-AdjacentTXWebb County138 kV100 MW3.4 yrs68.5
UNKNOWN300747Substation-AdjacentTXWebb County138 kV100 MW3.4 yrs68.5
UNKNOWN307036Substation-AdjacentTXWebb County138 kV100 MW3.4 yrs68.1
UNKNOWN304905Substation-AdjacentTXWebb County138 kV100 MW3.4 yrs67.9

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for CENIZO substation, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.