BUFFALO GAP WIND FARM

Substation

Texas · TAYLOR ELECTRIC COOP INC - (TX)

Max voltage
138
kV

BUFFALO GAP WIND FARM is an electric transmission substation in Texas, operated by TAYLOR ELECTRIC COOP INC - (TX). It is classified as sub-transmission (138 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines1

Ownership & operation

OperatorTAYLOR ELECTRIC COOP INC - (TX)
StateTexas
Coordinates32.2956, -100.1164

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#89039138 kVTAYLOR ELECTRIC COOP INC - (TX)0.3 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of BUFFALO GAP WIND FARM, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near BUFFALO GAP WIND FARM substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN307500Substation-AdjacentTXTaylor County345 kV600 MW3.4 yrs69.9
SWEETWATER EASTSubstation-AdjacentTXNolan County345 kV600 MW3.4 yrs69.8
ABILENE MULBERRY CREEKSubstation-AdjacentTXTaylor County345 kV600 MW3.4 yrs69.6
UNKNOWN304492Substation-AdjacentTXNolan County345 kV600 MW3.4 yrs68.8
CENTRAL BLUFFSubstation-AdjacentTXTaylor County345 kV600 MW3.4 yrs68.3
UNKNOWN302050Substation-AdjacentTXTaylor County138 kV100 MW3.4 yrs67.3
ABILENE ELMCREEKSubstation-AdjacentTXTaylor County138 kV100 MW3.4 yrs67.0
UNKNOWN306043Substation-AdjacentTXTaylor County138 kV100 MW3.4 yrs66.6

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for BUFFALO GAP WIND FARM substation, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.