BOSQUE

Substation

Texas · ONCOR ELECTRIC DELIVERY CO.

Max voltage
345
kV

BOSQUE is an electric transmission substation in Texas, operated by ONCOR ELECTRIC DELIVERY CO.. It is classified as high-voltage (345 kv) and connects 5 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage345 kV
Min voltage138 kV
Voltage classHigh-voltage (345 kV)
Connected lines5

Ownership & operation

OperatorONCOR ELECTRIC DELIVERY CO.
StateTexas
Coordinates31.8606, -97.3652

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#91221345 kVONCOR ELECTRIC DELIVERY CO.IN SERVICE19.2 mi
#81028138 kVONCOR ELECTRIC DELIVERY CO.0.7 mi
#84281138 kVONCOR ELECTRIC DELIVERY CO.1.2 mi
#87751138 kVONCOR ELECTRIC DELIVERY CO.IN SERVICE17.5 mi
#92853138 kVONCOR ELECTRIC DELIVERY CO.26.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of BOSQUE, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near BOSQUE substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
Lake CreekBrownfieldTXMcLennan1,357 MW73.1
LAKE CREEKSubstation-AdjacentTXMcLennan County345 kV600 MW3.4 yrs72.8
ELM MOTT 345Substation-AdjacentTXMcLennan County345 kV600 MW3.4 yrs72.4
UNKNOWN306704Substation-AdjacentTXMcLennan County345 kV600 MW3.4 yrs70.7
UNKNOWN300781Substation-AdjacentTXSomervell County345 kV600 MW3.4 yrs68.7
UNKNOWN301218Substation-AdjacentTXMcLennan County161 kV100 MW3.4 yrs68.6
UNKNOWN309681Substation-AdjacentTXMcLennan County138 kV100 MW3.4 yrs68.5
HILLSBOROSubstation-AdjacentTXHill County345 kV600 MW3.4 yrs68.3

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for BOSQUE substation, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.