BORDEN CO

Substation

Texas · LYNTEGAR ELECTRIC COOP, INC

Max voltage
230
kV

BORDEN CO is an electric transmission substation in Texas, operated by LYNTEGAR ELECTRIC COOP, INC. It is classified as high-voltage (230 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage138 kV
Voltage classHigh-voltage (230 kV)
Connected lines3

Ownership & operation

OperatorLYNTEGAR ELECTRIC COOP, INC
Co-ownerONCOR ELECTRIC DELIVERY CO.
StateTexas
Coordinates32.4102, -101.6872

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#88814230 kVLYNTEGAR ELECTRIC COOP, INCIN SERVICE34.1 mi
#80196138 kVONCOR ELECTRIC DELIVERY CO.IN SERVICE49.7 mi
#80487138 kVONCOR ELECTRIC DELIVERY CO.IN SERVICE16.8 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of BORDEN CO, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near BORDEN CO substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN310087Substation-AdjacentTXMartin County345 kV600 MW3.4 yrs69.6
UNKNOWN306995Substation-AdjacentTXHoward County345 kV600 MW3.4 yrs68.8
UNKNOWN308253Substation-AdjacentTXHoward County345 kV600 MW3.4 yrs68.6
UNKNOWN301162Substation-AdjacentTXMidland County345 kV600 MW3.4 yrs67.8
UNKNOWN305803Substation-AdjacentTXBorden County345 kV600 MW3.4 yrs67.8
UNKNOWN307631Substation-AdjacentTXHoward County345 kV600 MW3.4 yrs66.4
BORDEN COSubstation-AdjacentTXHoward County230 kV300 MW3.4 yrs64.1
UNKNOWN309579Substation-AdjacentTXMartin County138 kV100 MW3.4 yrs63.3

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for BORDEN CO substation, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.