BLESSING

Substation

Texas · AEP TEXAS CENTRAL CO.

Max voltage
345
kV

BLESSING is an electric transmission substation in Texas, operated by AEP TEXAS CENTRAL CO.. It is classified as high-voltage (345 kv) and connects 7 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage345 kV
Min voltage138 kV
Voltage classHigh-voltage (345 kV)
Connected lines7

Ownership & operation

OperatorAEP TEXAS CENTRAL CO.
Co-ownerAEP TEXAS CENTRAL COMPANY
StateTexas
Coordinates28.9140, -96.1970

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#88879345 kVIN SERVICE13.4 mi
#85373138 kVIN SERVICE42.0 mi
#85804138 kVAEP TEXAS CENTRAL CO.IN SERVICE5.9 mi
#84358138 kVAEP TEXAS CENTRAL COMPANYIN SERVICE15.7 mi
#88589138 kVAEP TEXAS CENTRAL COMPANY22.4 mi
#89173138 kVAEP TEXAS CENTRAL COMPANY25.7 mi
#87188138 kVAEP TEXAS CENTRAL CO.9.9 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of BLESSING, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near BLESSING substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
SOUTH TEXAS PROJECTSubstation-AdjacentTXMatagorda County345 kV600 MW3.4 yrs66.8
BLESSINGSubstation-AdjacentTXMatagorda County345 kV600 MW3.4 yrs65.0
UNKNOWN308688Substation-AdjacentTXWharton County138 kV100 MW3.4 yrs64.3
UNKNOWN305897Substation-AdjacentTXCalhoun County138 kV100 MW3.4 yrs64.0
UNKNOWN302074Substation-AdjacentTXMatagorda County138 kV100 MW3.4 yrs63.1
UNKNOWN306528Substation-AdjacentTXCalhoun County138 kV100 MW3.4 yrs63.1
UNKNOWN304209Substation-AdjacentTXWharton County138 kV100 MW3.4 yrs63.1
NEW GULFSubstation-AdjacentTXWharton County138 kV100 MW3.4 yrs63.0

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for BLESSING substation, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.