BIG LAKE

Substation

Texas · CONCHO VALLEY ELEC COOP INC

Max voltage
138
kV

BIG LAKE is an electric transmission substation in Texas, operated by CONCHO VALLEY ELEC COOP INC. It is classified as sub-transmission (138 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines1

Ownership & operation

OperatorCONCHO VALLEY ELEC COOP INC
StateTexas
Coordinates31.1849, -101.4614

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#87288138 kVCONCHO VALLEY ELEC COOP INCIN SERVICE34.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of BIG LAKE, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near BIG LAKE substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
BIG LAKESubstation-AdjacentTXReagan County138 kV100 MW3.4 yrs62.7
Greenfield (BIG HILL - BAKERSFIELD)GreenfieldTXCrockett County345 kV600 MW3.4 yrs60.9
UNKNOWN300315Substation-AdjacentTXReagan County138 kV100 MW3.4 yrs60.9
Greenfield (BIG HILL - BAKERSFIELD)GreenfieldTXCrockett County345 kV600 MW3.4 yrs60.4
Greenfield (BIG HILL - BAKERSFIELD)GreenfieldTXIrion County345 kV600 MW3.4 yrs60.0
Greenfield (BIG HILL - BAKERSFIELD)GreenfieldTXCrockett County345 kV600 MW3.4 yrs59.1
TAP315833Substation-AdjacentTXCrockett County138 kV100 MW3.4 yrs58.8
Greenfield (BIG HILL - BAKERSFIELD)GreenfieldTXUpton County345 kV600 MW3.4 yrs58.7

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for BIG LAKE substation, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.