BEAVER COUNTY

Substation

Texas · TRI-COUNTY ELECTRIC COOP, INC

Max voltage
345
kV

BEAVER COUNTY is an electric transmission substation in Texas, operated by TRI-COUNTY ELECTRIC COOP, INC. It is classified as high-voltage (345 kv) and connects 4 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage345 kV
Min voltage345 kV
Voltage classHigh-voltage (345 kV)
Connected lines4

Ownership & operation

OperatorTRI-COUNTY ELECTRIC COOP, INC
StateTexas
Coordinates36.5252, -100.9499

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#13723345 kVTRI-COUNTY ELECTRIC COOP, INCIN SERVICE29.7 mi
#13724345 kVTRI-COUNTY ELECTRIC COOP, INCIN SERVICE29.6 mi
#13731345 kVIN SERVICE98.8 mi
#13733345 kVIN SERVICE98.7 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of BEAVER COUNTY, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near BEAVER COUNTY substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN148745Substation-AdjacentTXOchiltree County345 kV600 MW3.5 yrs65.8
Greenfield (UNKNOWN209699 - HITCHLAND)GreenfieldOKTexas County345 kV600 MW3.4 yrs65.8
Greenfield (UNKNOWN209699 - HITCHLAND)GreenfieldOKTexas County345 kV600 MW3.4 yrs64.5
Greenfield (UNKNOWN209699 - HITCHLAND)GreenfieldOKTexas County345 kV600 MW3.4 yrs64.0
BEAVER COUNTYSubstation-AdjacentTXOchiltree County345 kV600 MW3.5 yrs63.9
COLESubstation-AdjacentTXOchiltree County115 kV100 MW3.4 yrs63.9
UNKNOWN119632Substation-AdjacentKSSeward County115 kV100 MW3.5 yrs63.6
Greenfield (BEAVER COUNTY - HITCHLAND)GreenfieldOKTexas County345 kV600 MW3.4 yrs63.5

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for BEAVER COUNTY substation, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.