ANACACHO WIND FARM, LLC

Substation

Texas · AEP TEXAS CENTRAL COMPANY

Max voltage
138
kV

ANACACHO WIND FARM, LLC is an electric transmission substation in Texas, operated by AEP TEXAS CENTRAL COMPANY. It is classified as sub-transmission (138 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines1

Ownership & operation

OperatorAEP TEXAS CENTRAL COMPANY
StateTexas
Coordinates29.2028, -100.1743

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#90280138 kVAEP TEXAS CENTRAL COMPANY0.2 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of ANACACHO WIND FARM, LLC, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near ANACACHO WIND FARM, LLC substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
ASPHALT MINESSubstation-AdjacentTXUvalde County138 kV100 MW3.4 yrs60.5
UNKNOWN303114Substation-AdjacentTXMaverick County138 kV100 MW3.4 yrs59.7
UVALDESubstation-AdjacentTXUvalde County138 kV100 MW3.4 yrs59.4
ANACACHO WIND FARM, LLCSubstation-AdjacentTXKinney County138 kV100 MW3.4 yrs59.0
UNKNOWN304210Substation-AdjacentTXKinney County138 kV100 MW3.4 yrs59.0
BRACKETVILLESubstation-AdjacentTXKinney County138 kV100 MW3.4 yrs58.6
EC FFE Kinney CountyGreenfieldTXKinney County3.4 yrs55.1
EC Coal Kinney CountyGreenfieldTXKinney County3.4 yrs54.9

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for ANACACHO WIND FARM, LLC substation, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.