AMELIA BULK

Substation

Texas · ENTERGY TEXAS, INC.

Max voltage
230
kV

AMELIA BULK is an electric transmission substation in Texas, operated by ENTERGY TEXAS, INC.. It is classified as high-voltage (230 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines3

Ownership & operation

OperatorENTERGY TEXAS, INC.
StateTexas
Coordinates30.0772, -94.2342

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#81071230 kVENTERGY TEXAS, INC.IN SERVICE10.3 mi
#81429230 kVENTERGY TEXAS, INC.5.7 mi
#86857230 kVENTERGY TEXAS, INC.IN SERVICE17.2 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of AMELIA BULK, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near AMELIA BULK substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
CYPRESSSubstation-AdjacentTXHardin County500 kV1,000 MW3.4 yrs71.0
KOLBSSubstation-AdjacentTXJefferson County230 kV300 MW3.4 yrs66.6
TAP310882Substation-AdjacentTXJefferson County230 kV300 MW3.4 yrs66.5
UNKNOWN302879Substation-AdjacentTXJefferson County230 kV300 MW3.4 yrs65.7
GULFWAYSubstation-AdjacentTXOrange County230 kV300 MW3.4 yrs65.6
HELBIGSubstation-AdjacentTXOrange County230 kV300 MW3.4 yrs65.6
CHINASubstation-AdjacentTXJefferson County230 kV300 MW3.4 yrs65.2
UNKNOWN304113Substation-AdjacentTXOrange County230 kV300 MW3.4 yrs65.1

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for AMELIA BULK substation, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.