AMD

Substation

Texas · BANDERA ELECTRIC COOP, INC

Max voltage
138
kV

AMD is an electric transmission substation in Texas, operated by BANDERA ELECTRIC COOP, INC. It is classified as sub-transmission (138 kv) and connects 4 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines4

Ownership & operation

OperatorBANDERA ELECTRIC COOP, INC
Co-ownerONCOR ELECTRIC DELIVERY CO.
StateTexas
Coordinates29.8321, -98.1819

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#81443138 kVBANDERA ELECTRIC COOP, INCIN SERVICE3.9 mi
#83805138 kVONCOR ELECTRIC DELIVERY CO.1.0 mi
#87353138 kVBANDERA ELECTRIC COOP, INC0.1 mi
#88634138 kVONCOR ELECTRIC DELIVERY CO.IN SERVICE0.4 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of AMD, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near AMD substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
SKYLINESubstation-AdjacentTXBexar County345 kV600 MW3.4 yrs75.7
HILL COUNTRY 345Substation-AdjacentTXBexar County345 kV600 MW3.4 yrs73.9
Guadalupe Generating StationBrownfieldTXGuadalupe320 MW72.6
MARIONSubstation-AdjacentTXGuadalupe County345 kV600 MW3.4 yrs72.4
ELM CREEKSubstation-AdjacentTXGuadalupe County345 kV600 MW3.4 yrs71.2
CLEAR SPRINGSSubstation-AdjacentTXGuadalupe County345 kV600 MW3.4 yrs71.1
RIO NOGALES SWITCHYARDSubstation-AdjacentTXGuadalupe County345 kV600 MW3.4 yrs70.8
AUSTIN ROADSubstation-AdjacentTXBexar County138 kV100 MW3.4 yrs70.0

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for AMD substation, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.