ALVARADO

Substation

Texas · ONCOR ELECTRIC DELIVERY CO.

Max voltage
138
kV

ALVARADO is an electric transmission substation in Texas, operated by ONCOR ELECTRIC DELIVERY CO.. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

OperatorONCOR ELECTRIC DELIVERY CO.
StateTexas
Coordinates32.3963, -97.2235

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#89112138 kVONCOR ELECTRIC DELIVERY CO.IN SERVICE9.4 mi
#90043138 kVONCOR ELECTRIC DELIVERY CO.6.9 mi
#91490138 kVONCOR ELECTRIC DELIVERY CO.10.6 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of ALVARADO, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near ALVARADO substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN308533Substation-AdjacentTXTarrant County345 kV600 MW3.4 yrs74.0
SHERRYSubstation-AdjacentTXTarrant County345 kV600 MW3.4 yrs74.0
UNKNOWN301121Substation-AdjacentTXTarrant County345 kV600 MW3.4 yrs73.9
UNKNOWN302319Substation-AdjacentTXTarrant County345 kV600 MW3.4 yrs73.9
UNKNOWN309031Substation-AdjacentTXTarrant County345 kV600 MW3.4 yrs73.5
UNKNOWN304324Substation-AdjacentTXTarrant County345 kV600 MW3.4 yrs73.3
VENUSSubstation-AdjacentTXEllis County345 kV600 MW3.4 yrs73.3
DESOTO SWSubstation-AdjacentTXEllis County345 kV600 MW3.4 yrs73.0

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for ALVARADO substation, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.