ALMA
SubstationTexas · OKLAHOMA GAS & ELECTRIC CO
ALMA is an electric transmission substation in Texas, operated by OKLAHOMA GAS & ELECTRIC CO. It is classified as sub-transmission (138 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #14174 | 161 kV | OKLAHOMA GAS & ELECTRIC CO | IN SERVICE | 2.9 mi |
| #14175 | 161 kV | OKLAHOMA GAS & ELECTRIC CO | IN SERVICE | 1.1 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of ALMA, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| FORT SMITH | Substation-Adjacent | OK | Sequoyah County | 500 kV | 1,000 MW | 3.4 yrs | 74.4 |
| UNKNOWN107800 | Substation-Adjacent | AR | Sebastian County | 161 kV | 100 MW | 3.4 yrs | 67.0 |
| UNKNOWN121673 | Substation-Adjacent | AR | Crawford County | 161 kV | 100 MW | 3.4 yrs | 66.8 |
| TAP149665 | Substation-Adjacent | AR | Sebastian County | 161 kV | 100 MW | 3.4 yrs | 66.7 |
| THOMAS FITZHUGH | Substation-Adjacent | AR | Franklin County | 161 kV | 100 MW | 3.4 yrs | 66.6 |
| Greenfield (FORT SMITH - ARKANSAS NUCLEAR ) | Greenfield | AR | Sebastian County | 500 kV | 1,000 MW | 3.4 yrs | 66.6 |
| THIRD STREET | Substation-Adjacent | AR | Sebastian County | 161 kV | 100 MW | 3.4 yrs | 66.6 |
| BATTLEFIELD | Substation-Adjacent | AR | Sebastian County | 161 kV | 100 MW | 3.4 yrs | 66.4 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for ALMA substation, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.