ALIBATES

Substation

Texas · SOUTHWESTERN PUBLIC SERVICE CO

Max voltage
345
kV

ALIBATES is an electric transmission substation in Texas, operated by SOUTHWESTERN PUBLIC SERVICE CO. It is classified as high-voltage (345 kv) and connects 5 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage345 kV
Min voltage345 kV
Voltage classHigh-voltage (345 kV)
Connected lines5

Ownership & operation

OperatorSOUTHWESTERN PUBLIC SERVICE CO
Co-ownerSOUTHWESTERN PUBLIC SERVICE CO.
StateTexas
Coordinates35.2549, -101.3594

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#87724345 kVSOUTHWESTERN PUBLIC SERVICE CO.IN SERVICE41.1 mi
#88899345 kVSOUTHWESTERN PUBLIC SERVICE COIN SERVICE66.6 mi
#89309345 kVSOUTHWESTERN PUBLIC SERVICE CO.IN SERVICE46.4 mi
#89680345 kVSOUTHWESTERN PUBLIC SERVICE COIN SERVICE66.6 mi
#90140345 kVSOUTHWESTERN PUBLIC SERVICE CO.IN SERVICE21.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of ALIBATES, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near ALIBATES substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
HARRINGTONSubstation-AdjacentTXPotter County230 kV300 MW3.4 yrs72.9
TAP302718Substation-AdjacentTXPotter County230 kV300 MW3.4 yrs72.2
ALIBATESSubstation-AdjacentTXCarson County345 kV600 MW3.4 yrs69.7
RAILHEADSubstation-AdjacentTXCarson County345 kV600 MW3.4 yrs69.0
OSubstation-AdjacentTXPotter County115 kV100 MW3.4 yrs68.8
DSubstation-AdjacentTXPotter County115 kV100 MW3.4 yrs68.5
AASubstation-AdjacentTXRandall County115 kV100 MW3.4 yrs68.1
HIGHLAND PARKSubstation-AdjacentTXPotter County115 kV100 MW3.4 yrs67.9

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen