WINCHESTER is an electric transmission substation in Tennessee, operated by TENNESSEE VALLEY AUTHORITY. It is classified as sub-transmission (138 kv) and connects 4 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage161 kV
Min voltage161 kV
Voltage classSub-transmission (138 kV)
Connected lines4

Ownership & operation

OperatorTENNESSEE VALLEY AUTHORITY
Coordinates35.2459, -86.0419

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#5223161 kVTENNESSEE VALLEY AUTHORITYIN SERVICE14.1 mi
#19056161 kVTENNESSEE VALLEY AUTHORITYIN SERVICE28.1 mi
#48203161 kVTENNESSEE VALLEY AUTHORITYIN SERVICE0.1 mi
#49010161 kVTENNESSEE VALLEY AUTHORITYIN SERVICE4.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of WINCHESTER, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near WINCHESTER substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
WIDOWS CREEK 500KVSubstation-AdjacentGADade County500 kV1,000 MW3.7 yrs78.8
FRANKLINSubstation-AdjacentTNBedford County500 kV1,000 MW3.7 yrs75.5
CUMMINGSSubstation-AdjacentGADade County161 kV100 MW3.7 yrs74.0
Greenfield (TAP153403 - WIDOWS CREEK 500KV)GreenfieldALJackson County500 kV1,000 MW3.7 yrs72.1
Greenfield (SEQUOYAH - FRANKLIN)GreenfieldTNCoffee County500 kV1,000 MW3.7 yrs71.0
TAP155375Substation-AdjacentTNMarion County161 kV100 MW3.7 yrs70.8
Greenfield (MAURY - FRANKLIN)GreenfieldTNMoore County500 kV1,000 MW3.7 yrs70.7
Greenfield (SEQUOYAH - FRANKLIN)GreenfieldTNGrundy County500 kV1,000 MW3.7 yrs70.6

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for WINCHESTER substation, Tennessee. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.