WEBSTER TIE

Substation

Tennessee · DUKE ENERGY CAROLINAS, LLC

Max voltage
161
kV

WEBSTER TIE is an electric transmission substation in Tennessee, operated by DUKE ENERGY CAROLINAS, LLC. It is classified as sub-transmission (138 kv) and connects 5 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage161 kV
Min voltage161 kV
Voltage classSub-transmission (138 kV)
Connected lines5

Ownership & operation

OperatorDUKE ENERGY CAROLINAS, LLC
Coordinates35.3325, -83.2892

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#1048161 kVIN SERVICE0.0 mi
#48177161 kVIN SERVICE7.6 mi
#57593161 kVIN SERVICE10.5 mi
#57631161 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE12.8 mi
#57659161 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE25.8 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of WEBSTER TIE, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near WEBSTER TIE substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN169765Substation-AdjacentNCJackson County161 kV100 MW3.7 yrs73.5
TAP145903Substation-AdjacentNCJackson County161 kV100 MW3.7 yrs72.4
TAP169766Substation-AdjacentNCJackson County161 kV100 MW3.7 yrs71.9
TUCKASEGEESubstation-AdjacentNCJackson County161 kV100 MW3.7 yrs71.7
UNKNOWN110048Substation-AdjacentNCJackson County161 kV100 MW3.7 yrs71.0
TAP145904Substation-AdjacentNCJackson County161 kV100 MW3.7 yrs70.5
JOCASSEE TIESubstation-AdjacentSCPickens County500 kV1,000 MW3.7 yrs70.0
UNKNOWN109816Substation-AdjacentNCJackson County161 kV100 MW3.7 yrs69.5

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for WEBSTER TIE substation, Tennessee. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.