WATTS BAR FOSSIL

Substation

Tennessee · TENNESSEE VALLEY AUTHORITY

Max voltage
161
kV

WATTS BAR FOSSIL is an electric transmission substation in Tennessee, operated by TENNESSEE VALLEY AUTHORITY. It is classified as sub-transmission (138 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage161 kV
Min voltage161 kV
Voltage classSub-transmission (138 kV)
Connected lines1

Ownership & operation

OperatorTENNESSEE VALLEY AUTHORITY
Coordinates35.6195, -84.7857

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#34452161 kVTENNESSEE VALLEY AUTHORITYIN SERVICE0.7 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of WATTS BAR FOSSIL, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near WATTS BAR FOSSIL substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
SEQUOYAHSubstation-AdjacentTNHamilton County500 kV1,000 MW3.7 yrs79.1
UNKNOWN170313Substation-AdjacentTNMcMinn County500 kV1,000 MW3.7 yrs73.5
Greenfield (BULL RUN - WATTS BAR POWER STA)GreenfieldTNMeigs County500 kV1,000 MW3.7 yrs71.4
WATTS BAR POWER STATIONSubstation-AdjacentTNMeigs County500 kV1,000 MW3.7 yrs71.0
Greenfield (VOLUNTEER - WATTS BAR POWER ST)GreenfieldTNLoudon County500 kV1,000 MW3.7 yrs71.0
TAP152029Substation-AdjacentTNLoudon County161 kV100 MW3.7 yrs70.9
Greenfield (UNKNOWN115540 - WILSON)GreenfieldTNRoane County500 kV1,000 MW3.7 yrs70.9
Greenfield (UNKNOWN115540 - WILSON)GreenfieldTNRoane County500 kV1,000 MW3.7 yrs70.7

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for WATTS BAR FOSSIL substation, Tennessee. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.