TUSCULUM

Substation

Tennessee · KINGSPORT POWER CO

Max voltage
161
kV

TUSCULUM is an electric transmission substation in Tennessee, operated by KINGSPORT POWER CO. It is classified as sub-transmission (138 kv) and connects 4 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage161 kV
Min voltage161 kV
Voltage classSub-transmission (138 kV)
Connected lines4

Ownership & operation

OperatorKINGSPORT POWER CO
Co-ownerTENNESSEE VALLEY AUTHORITY
Coordinates36.2460, -82.7919

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#1520161 kVTENNESSEE VALLEY AUTHORITYIN SERVICE0.1 mi
#6219161 kVTENNESSEE VALLEY AUTHORITYIN SERVICE0.1 mi
#17606161 kVIN SERVICE2.1 mi
#20624161 kVKINGSPORT POWER COIN SERVICE18.7 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TUSCULUM, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TUSCULUM substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
NAGELSubstation-AdjacentVAScott County500 kV1,000 MW3.7 yrs78.2
PHILLIPS BENDSubstation-AdjacentTNHawkins County500 kV1,000 MW3.7 yrs77.2
Greenfield (PHILLIPS BEND - NAGEL)GreenfieldVAScott County500 kV1,000 MW3.7 yrs73.9
Greenfield (SULLIVAN - NAGEL)GreenfieldTNHawkins County500 kV1,000 MW3.7 yrs73.1
Greenfield (SULLIVAN - NAGEL)GreenfieldTNSullivan County500 kV1,000 MW3.7 yrs72.4
Greenfield (SULLIVAN - NAGEL)GreenfieldTNHawkins County500 kV1,000 MW3.7 yrs71.6
Greenfield (SULLIVAN - PHILLIPS BEND)GreenfieldTNWashington County500 kV1,000 MW3.7 yrs71.6
UNKNOWN115300Substation-AdjacentVAScott County138 kV100 MW3.7 yrs71.6

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TUSCULUM substation, Tennessee. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.