TUCKASEGEE TIE

Substation

Tennessee · DUKE ENERGY CAROLINAS, LLC

Max voltage
230
kV

TUCKASEGEE TIE is an electric transmission substation in Tennessee, operated by DUKE ENERGY CAROLINAS, LLC. It is classified as high-voltage (230 kv) and connects 5 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage161 kV
Voltage classHigh-voltage (230 kV)
Connected lines5

Ownership & operation

OperatorDUKE ENERGY CAROLINAS, LLC
Coordinates35.2076, -83.1376

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#58445230 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE26.7 mi
#58446230 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE26.7 mi
#57587161 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE23.1 mi
#57593161 kVIN SERVICE10.5 mi
#64862161 kVIN SERVICE3.2 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TUCKASEGEE TIE, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TUCKASEGEE TIE substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN169765Substation-AdjacentNCJackson County161 kV100 MW3.7 yrs73.5
TAP145903Substation-AdjacentNCJackson County161 kV100 MW3.7 yrs72.4
TAP169766Substation-AdjacentNCJackson County161 kV100 MW3.7 yrs71.9
TUCKASEGEESubstation-AdjacentNCJackson County161 kV100 MW3.7 yrs71.7
UNKNOWN110048Substation-AdjacentNCJackson County161 kV100 MW3.7 yrs71.0
TAP145904Substation-AdjacentNCJackson County161 kV100 MW3.7 yrs70.5
JOCASSEE TIESubstation-AdjacentSCPickens County500 kV1,000 MW3.7 yrs70.0
Greenfield (UNKNOWN111199 - JOCASSEE TIE)GreenfieldSCPickens County500 kV1,000 MW3.7 yrs69.7

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TUCKASEGEE TIE substation, Tennessee. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.