TIGER TIE

Substation

Tennessee · DUKE ENERGY CAROLINAS, LLC

Max voltage
230
kV

TIGER TIE is an electric transmission substation in Tennessee, operated by DUKE ENERGY CAROLINAS, LLC. It is classified as high-voltage (230 kv) and connects 8 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage100 kV
Voltage classHigh-voltage (230 kV)
Connected lines8

Ownership & operation

OperatorDUKE ENERGY CAROLINAS, LLC
Coordinates34.9967, -82.0703

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#25591230 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE21.5 mi
#6566230 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE15.7 mi
#48531230 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE21.5 mi
#24849230 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE15.7 mi
#48776100 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE4.8 mi
#24039100 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE4.8 mi
#42321100 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE6.5 mi
#4672100 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE6.5 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TIGER TIE, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TIGER TIE substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN111199Substation-AdjacentNCCleveland County500 kV1,000 MW3.7 yrs79.9
JAMES E. ROGERS ENERGY COMPLEXSubstation-AdjacentNCCleveland County500 kV1,000 MW3.7 yrs77.6
TIGER TIESubstation-AdjacentSCSpartanburg County230 kV300 MW3.7 yrs75.4
PACOLET TIESubstation-AdjacentSCCherokee County230 kV300 MW3.7 yrs74.7
James E. Rogers Energy ComplexBrownfieldNCRutherford1,010 MW71.9
Greenfield (UNKNOWN111199 - JOCASSEE TIE)GreenfieldNCPolk County500 kV1,000 MW3.7 yrs71.1
Greenfield (TIGER TIE - PEACH VALLEY TIE)GreenfieldSCSpartanburg County230 kV300 MW3.7 yrs71.0
UNKNOWN110875Substation-AdjacentNCRutherford County115 kV100 MW3.7 yrs70.3

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TIGER TIE substation, Tennessee. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.