TAP173453

Substation

Tennessee

Max voltage
115
kV

TAP173453 is an electric transmission substation in Tennessee. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

Operator not catalogued for this substation.

Coordinates35.2874, -81.8530

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#51262115 kVIN SERVICE0.0 mi
#51278115 kVIN SERVICE8.5 mi
#57932115 kVIN SERVICE0.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP173453, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP173453 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN111199Substation-AdjacentNCCleveland County500 kV1,000 MW3.7 yrs79.9
JAMES E. ROGERS ENERGY COMPLEXSubstation-AdjacentNCCleveland County500 kV1,000 MW3.7 yrs77.6
TIGER TIESubstation-AdjacentSCSpartanburg County230 kV300 MW3.7 yrs75.4
PACOLET TIESubstation-AdjacentSCCherokee County230 kV300 MW3.7 yrs74.7
SHELBY TIESubstation-AdjacentNCCleveland County230 kV300 MW3.7 yrs73.9
James E. Rogers Energy ComplexBrownfieldNCRutherford1,010 MW71.9
Greenfield (UNKNOWN111199 - JOCASSEE TIE)GreenfieldNCPolk County500 kV1,000 MW3.7 yrs71.1
Greenfield (TIGER TIE - PEACH VALLEY TIE)GreenfieldSCSpartanburg County230 kV300 MW3.7 yrs71.0

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP173453 substation, Tennessee. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.