TAP173375

Substation

Tennessee · TENNESSEE VALLEY AUTHORITY

Max voltage
161
kV

TAP173375 is an electric transmission substation in Tennessee, operated by TENNESSEE VALLEY AUTHORITY. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage161 kV
Min voltage161 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

OperatorTENNESSEE VALLEY AUTHORITY
Coordinates35.7552, -85.3655

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#9861161 kVIN SERVICE0.2 mi
#10144161 kVTENNESSEE VALLEY AUTHORITYIN SERVICE21.2 mi
#53135161 kVTENNESSEE VALLEY AUTHORITYIN SERVICE25.5 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP173375, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP173375 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
Greenfield (UNKNOWN115540 - WILSON)GreenfieldTNPutnam County500 kV1,000 MW3.7 yrs71.6
DOUBLE SPRINGSSubstation-AdjacentTNPutnam County161 kV100 MW3.7 yrs70.6
TAP155428Substation-AdjacentTNCumberland County161 kV100 MW3.7 yrs70.2
Greenfield (UNKNOWN115540 - WILSON)GreenfieldTNDeKalb County500 kV1,000 MW3.7 yrs70.1
CAMPBELL JUNCTIONSubstation-AdjacentTNCumberland County161 kV100 MW3.7 yrs70.0
SOUTH COOKEVILLESubstation-AdjacentTNPutnam County161 kV100 MW3.7 yrs69.8
TAP155415Substation-AdjacentTNSequatchie County161 kV100 MW3.7 yrs69.8
Greenfield (UNKNOWN115540 - WILSON)GreenfieldTNPutnam County500 kV1,000 MW3.7 yrs69.8

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP173375 substation, Tennessee. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.