TAP169805

Substation

Tennessee

Max voltage
100
kV

TAP169805 is an electric transmission substation in Tennessee. It is classified as distribution (69–115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage100 kV
Min voltage100 kV
Voltage classDistribution (69–115 kV)
Connected lines3

Ownership & operation

Operator not catalogued for this substation.

Coordinates35.7693, -82.0134

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#56429100 kVIN SERVICE0.5 mi
#56430100 kVIN SERVICE0.2 mi
#57607100 kVIN SERVICE4.4 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP169805, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP169805 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
CANE RIVERSubstation-AdjacentNCYancey County230 kV300 MW3.7 yrs69.9
MCDOWELLSubstation-AdjacentNCMcDowell County230 kV300 MW3.7 yrs69.6
UNKNOWN110358Substation-AdjacentNCYancey County115 kV100 MW3.7 yrs68.9
Greenfield (CANE RIVER - NAGEL)GreenfieldTNUnicoi County230 kV300 MW3.7 yrs68.1
UNKNOWN109947Substation-AdjacentNCBuncombe County115 kV100 MW3.7 yrs67.9
Greenfield (LONGVIEW - MCDOWELL)GreenfieldNCBurke County230 kV300 MW3.7 yrs67.6
UNKNOWN110522Substation-AdjacentNCMcDowell County100 kV50 MW3.7 yrs67.2
TAP169809Substation-AdjacentNCRutherford County100 kV50 MW3.7 yrs67.1

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.