TAP155546

Substation

Tennessee · TENNESSEE VALLEY AUTHORITY

Max voltage
161
kV

TAP155546 is an electric transmission substation in Tennessee, operated by TENNESSEE VALLEY AUTHORITY. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage161 kV
Min voltage161 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

OperatorTENNESSEE VALLEY AUTHORITY
Coordinates36.5546, -86.2346

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#6564161 kVTENNESSEE VALLEY AUTHORITYIN SERVICE0.6 mi
#20934161 kVTENNESSEE VALLEY AUTHORITYIN SERVICE1.9 mi
#31859161 kVTENNESSEE VALLEY AUTHORITYIN SERVICE9.2 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP155546, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP155546 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
WILSONSubstation-AdjacentTNWilson County500 kV1,000 MW3.7 yrs78.0
EASTGATESubstation-AdjacentTNWilson County161 kV100 MW3.7 yrs72.9
TAP155558Substation-AdjacentTNSumner County161 kV100 MW3.7 yrs72.9
GALLATINSubstation-AdjacentTNSumner County161 kV100 MW3.7 yrs72.9
EAST GALLATINSubstation-AdjacentTNSumner County161 kV100 MW3.7 yrs72.6
LAKEVIEWSubstation-AdjacentTNDavidson County161 kV100 MW3.7 yrs72.4
TAP155553Substation-AdjacentKYSimpson County161 kV100 MW3.7 yrs72.2
TAP155551Substation-AdjacentTNWilson County161 kV100 MW3.7 yrs72.0

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP155546 substation, Tennessee. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.