TAP155477
SubstationTennessee · EAST KENTUCKY POWER COOP, INC
TAP155477 is an electric transmission substation in Tennessee, operated by EAST KENTUCKY POWER COOP, INC. It is classified as sub-transmission (138 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Ownership & operation
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #16494 | 161 kV | EAST KENTUCKY POWER COOP, INC | IN SERVICE | 30.1 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of TAP155477, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| TAP155465 | Substation-Adjacent | TN | Fentress County | 161 kV | 100 MW | 3.7 yrs | 68.1 |
| MONROE | Substation-Adjacent | TN | Overton County | 161 kV | 100 MW | 3.7 yrs | 67.8 |
| TAP155474 | Substation-Adjacent | TN | Fentress County | 161 kV | 100 MW | 3.7 yrs | 65.5 |
| UNKNOWN115294 | Substation-Adjacent | TN | Pickett County | 161 kV | 100 MW | 3.7 yrs | 65.2 |
| TAP155488 | Substation-Adjacent | KY | Pulaski County | 161 kV | 100 MW | 3.6 yrs | 64.0 |
| UNKNOWN124795 | Substation-Adjacent | KY | Pulaski County | 161 kV | 100 MW | 3.6 yrs | 63.1 |
| Greenfield (TAP155465 - TAP155466) | Greenfield | TN | Overton County | 161 kV | 100 MW | 3.7 yrs | 63.1 |
| UNKNOWN125402 | Substation-Adjacent | KY | Pulaski County | 161 kV | 100 MW | 3.6 yrs | 63.1 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for TAP155477 substation, Tennessee. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.