TAP155474

Substation

Tennessee · EAST KENTUCKY POWER COOP, INC

Max voltage
161
kV

TAP155474 is an electric transmission substation in Tennessee, operated by EAST KENTUCKY POWER COOP, INC. It is classified as sub-transmission (138 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage161 kV
Min voltage161 kV
Voltage classSub-transmission (138 kV)
Connected lines2

Ownership & operation

OperatorEAST KENTUCKY POWER COOP, INC
Coordinates36.4898, -84.8177

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#21146161 kVEAST KENTUCKY POWER COOP, INCIN SERVICE36.6 mi
#50042161 kVEAST KENTUCKY POWER COOP, INCIN SERVICE15.2 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP155474, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP155474 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
TAP155427Substation-AdjacentTNCumberland County161 kV100 MW3.7 yrs68.6
TAP155465Substation-AdjacentTNFentress County161 kV100 MW3.7 yrs68.1
WINFIELDSubstation-AdjacentKYMcCreary County161 kV100 MW3.7 yrs66.4
ONEIDASubstation-AdjacentTNScott County161 kV100 MW3.7 yrs66.4
MCCREARY COUNTYSubstation-AdjacentKYMcCreary County161 kV100 MW3.7 yrs65.7
TAP155474Substation-AdjacentTNFentress County161 kV100 MW3.7 yrs65.5
UNKNOWN115294Substation-AdjacentTNPickett County161 kV100 MW3.7 yrs65.2
Greenfield (ONEIDA - HUNTSVILLE)GreenfieldTNScott County161 kV100 MW3.7 yrs63.5

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP155474 substation, Tennessee. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.