TAP155439

Substation

Tennessee · TENNESSEE VALLEY AUTHORITY

Max voltage
161
kV

TAP155439 is an electric transmission substation in Tennessee, operated by TENNESSEE VALLEY AUTHORITY. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage161 kV
Min voltage161 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

OperatorTENNESSEE VALLEY AUTHORITY
Coordinates35.7570, -85.7185

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#20194161 kVTENNESSEE VALLEY AUTHORITYIN SERVICE2.7 mi
#25093161 kVTENNESSEE VALLEY AUTHORITYIN SERVICE9.9 mi
#43450161 kVTENNESSEE VALLEY AUTHORITYIN SERVICE4.3 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP155439, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP155439 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
Greenfield (UNKNOWN115540 - WILSON)GreenfieldTNPutnam County500 kV1,000 MW3.7 yrs71.6
DOUBLE SPRINGSSubstation-AdjacentTNPutnam County161 kV100 MW3.7 yrs70.6
Greenfield (UNKNOWN115540 - WILSON)GreenfieldTNDeKalb County500 kV1,000 MW3.7 yrs70.1
TAP155415Substation-AdjacentTNSequatchie County161 kV100 MW3.7 yrs69.8
SOUTH COOKEVILLESubstation-AdjacentTNPutnam County161 kV100 MW3.7 yrs69.8
TAP155431Substation-AdjacentTNPutnam County161 kV100 MW3.7 yrs69.7
TAP155432Substation-AdjacentTNPutnam County161 kV100 MW3.7 yrs69.7
MANCHESTERSubstation-AdjacentTNCoffee County161 kV100 MW3.7 yrs69.5

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen