TAP155415

Substation

Tennessee · TENNESSEE VALLEY AUTHORITY

Max voltage
161
kV

TAP155415 is an electric transmission substation in Tennessee, operated by TENNESSEE VALLEY AUTHORITY. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage161 kV
Min voltage161 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

OperatorTENNESSEE VALLEY AUTHORITY
Coordinates35.4126, -85.3849

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#15016161 kVTENNESSEE VALLEY AUTHORITYIN SERVICE0.0 mi
#36758161 kVTENNESSEE VALLEY AUTHORITYIN SERVICE9.6 mi
#38480161 kVTENNESSEE VALLEY AUTHORITYIN SERVICE18.5 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP155415, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP155415 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
SEQUOYAHSubstation-AdjacentTNHamilton County500 kV1,000 MW3.7 yrs79.1
TAP155408Substation-AdjacentTNBradley County500 kV1,000 MW3.7 yrs75.4
RIDGEDALESubstation-AdjacentTNHamilton County161 kV100 MW3.7 yrs75.1
HAWTHORNESubstation-AdjacentTNHamilton County161 kV100 MW3.7 yrs74.7
MOCCASINSubstation-AdjacentTNHamilton County161 kV100 MW3.7 yrs74.4
Greenfield (SEQUOYAH - FRANKLIN)GreenfieldTNSequatchie County500 kV1,000 MW3.7 yrs73.4
UNKNOWN115638Substation-AdjacentTNHamilton County161 kV100 MW3.7 yrs73.3
Greenfield (SEQUOYAH - FRANKLIN)GreenfieldTNHamilton County500 kV1,000 MW3.7 yrs73.2

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP155415 substation, Tennessee. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.