TAP154885 is an electric transmission substation in Tennessee. It is classified as distribution (69–115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Ownership & operation
Operator not catalogued for this substation.
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #13568 | 100 kV | — | IN SERVICE | 0.8 mi |
| #36678 | 100 kV | — | IN SERVICE | 3.0 mi |
| #47223 | 100 kV | — | IN SERVICE | 0.8 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of TAP154885, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| UNKNOWN110875 | Substation-Adjacent | NC | Rutherford County | 115 kV | 100 MW | 3.7 yrs | 70.3 |
| MCDOWELL | Substation-Adjacent | NC | McDowell County | 230 kV | 300 MW | 3.7 yrs | 69.6 |
| UNKNOWN110358 | Substation-Adjacent | NC | Yancey County | 115 kV | 100 MW | 3.7 yrs | 68.9 |
| Greenfield (UNKNOWN111199 - MCGUIRE) | Greenfield | NC | Cleveland County | 500 kV | 1,000 MW | 3.7 yrs | 68.8 |
| UNKNOWN109947 | Substation-Adjacent | NC | Buncombe County | 115 kV | 100 MW | 3.7 yrs | 67.9 |
| UNKNOWN110881 | Substation-Adjacent | NC | Rutherford County | 115 kV | 100 MW | 3.7 yrs | 67.8 |
| Greenfield (LONGVIEW - MCDOWELL) | Greenfield | NC | Burke County | 230 kV | 300 MW | 3.7 yrs | 67.6 |
| UNKNOWN110877 | Substation-Adjacent | NC | Rutherford County | 115 kV | 100 MW | 3.7 yrs | 67.3 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for TAP154885 substation, Tennessee. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.