TAP154864

Substation

Tennessee · DUKE ENERGY PROGRESS - (NC)

Max voltage
161
kV

TAP154864 is an electric transmission substation in Tennessee, operated by DUKE ENERGY PROGRESS - (NC). It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage161 kV
Min voltage161 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

OperatorDUKE ENERGY PROGRESS - (NC)
Coordinates36.0686, -81.9121

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#1188161 kVDUKE ENERGY PROGRESS - (NC)IN SERVICE6.3 mi
#3796161 kVDUKE ENERGY PROGRESS - (NC)IN SERVICE0.2 mi
#56841161 kVDUKE ENERGY PROGRESS - (NC)IN SERVICE3.7 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP154864, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP154864 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
BROADFORD (765 KV)Substation-AdjacentTNSullivan County500 kV1,000 MW3.7 yrs77.9
HAMPTONSubstation-AdjacentTNCarter County161 kV100 MW3.7 yrs70.0
ELIZABETHTONSubstation-AdjacentTNCarter County161 kV100 MW3.7 yrs69.1
NORTH JOHNSONSubstation-AdjacentTNSullivan County161 kV100 MW3.7 yrs69.0
UNKNOWN110358Substation-AdjacentNCYancey County115 kV100 MW3.7 yrs68.9
TAP154452Substation-AdjacentTNCarter County161 kV100 MW3.7 yrs68.0
Greenfield (LONGVIEW - MCDOWELL)GreenfieldNCBurke County230 kV300 MW3.7 yrs67.6
TAP153940Substation-AdjacentTNJohnson County161 kV100 MW3.7 yrs67.0

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP154864 substation, Tennessee. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.